Originally posted by Sci-Fi
Today, at another forum, one person stated that the dealer called him and said Chrysler is starting to accept orders for the GT 5-speed.
(EVD+DDD) 2.4L Turbo w/MTX production delayed until 10/21/02
If the above is true and the usual wait is 8-14 weeks, one could expect to see the GT 5-speeds in the showroom in late Dec - late Jan.
The hemi engine truck production has been delayed too:
(EZA) 5.7L engine production delayed until 12/2/02
|
Too bad about both delays. To tell you the truth, as much as I admire the PT Turbo, if I had the extra cash kicking around, I'd go for that Hemi Dodge truck! 
__________________
--JOEM\01 Base Cranberry Cruiser, painted flames by Mayabb's Hot Rods, Keystone Good Hood, PTeazer roll pan, Stull billet grille, Mooneyes '39 "Devil" taillights, Flipen Hood, Hurst shifter, JBA header, AirRaid intake system, PowerAid throttle body spacer, Bassani single exhaust, Wildfire strut bar, Progress lowering springs, Progress sway bars, chrome engine bits, lots of interior chrome and billet stuff. Moon discs, Futura Super Sport tires.
03 Dodge Ram HEMI (345 HP, no waiting)
|